Brown and Caldwell led the design-build-operate installation of a biological nutrient removal pilot facility located in Elk Grove, Calif. Winner of WERF’s 2014 Award for Excellence in Innovation, the pilot project provided critical information for the Sacramento Regional County Sanitation District’s EchoWater Project, a $1.5 to $2.0 billion upgrade of the District’s 181 mgd regional wastewater facility that serves 1.4 million customers.
Awards
-
2024
American Council of Engineering Companies, Engineering Excellence Award
-
2014
Water Environment Research Foundation, Award for Excellence in Innovation
-
2014
American Academy of Environmental Engineers and Scientists, Excellence in Engineering Honor Award for Research
Related Projects
Hyperion Advanced Water Purification Facility
Process Water Reclamation Facility
Big Creek Water Reclamation Facility
James R. DiIorio Water Reclamation Facility Ntensify® Nutrient Removal
Southwestern Parkway Combined Sewer Overflow Basin
Southeast Plant Biosolids Digester Facilities
Greenfield Water Reclamation Plant Expansion
Kaneohe-Kailua Regional Wastewater Treatment Plant, Facilities Plan, Tunnel Influent Pump Station (TIPS)
Lake Oswego Interceptor Sewer
New Class A Biosolids and Energy Facility at Blue Plains Advanced Wastewater Treatment Plant
Littleton/Englewood Wastewater Treatment Plant
Wastewater Plant Tertiary Treatment and Transmission Pipeline
Ultrafiltration Technology Pilot Study
Trickling Filter/Solids Contact System Design and Implementation
RM Clayton Water Reclamation Center Headworks
Pure Water San Diego Potable Reuse Program
Program Management
Oakley Station Separation Sewer Project
North 27th Street Inline Storage System
Johns Creek Environmental Campus
Industrial Reuse and Aquifer Replenishment Project
Indian Head Wastewater Treatment Plant Upgrades
Greenfield Pre-Treatment Plant
Dixie Drain Phosphorus Removal Facility
Discharge Treatment Analysis
Cogeneration System Upgrade
Chambers Creek Regional Wastewater Treatment Plant Expansion
Biosolids Flow-Through Thermophilic Treatment Design and Implementation
Annacis Island and Lulu Island Wastewater Treatment Plants
Biosolids Management Program Upgrade
Related News
- UMC 2025
- Rod Pope receives DBIA Distinguished Leadership Award
- Rehabilitating Derby City’s 150-year-old old sewer infrastructure puts the community first
- American Exploration & Mining Association
- BC Compliance News: November 2024 environmental regulations
- Water Quality Technology Conference
- CalCIMA Education Conference
- Idaho Mining Conference
- Brown and Caldwell joins 10th annual Imagine a Day Without Water campaign
- Pure Water Project Las Virgenes – Triunfo: Bringing the future to the present with a sustainable local water supply