Integrated Project Delivery
Integrated Project Delivery
Award-winning collaboration
At the end of the day, a successful design-build project comes down to working alongside people you can trust as true partners. Whether considering technical innovations, nailing down costs, or exploring creative delivery solutions, it’s essential that all players are working together with the same end-goal in sight. Call on Brown and Caldwell—we combine construction know-how with world-class engineering and exceptional client service to achieve higher quality, expedite schedules, and reduce capital and operations costs. From designing and building nimble, scalable, and effective remediation strategies to complex phased renovations and new construction, we’re ready to roll up our sleeves and partner with you to move your project from concept to completion.
Awards
-
2025
Engineering News Record - Regional Best Projects (West Region - Southern California), Award of Merit in the Water/Environment Category, Hyperion Advanced Water Purification Facility
-
2025
Design-Build Institute of America , National Award of Merit in Water/Wastewater Category
-
2025
Design-Build Institute of America , National Award of Merit in Water/Wastewater Category
-
2025
Design-Build Institute of America , National Award of Merit in Water/Wastewater Category, Big Creek Water Reclamation Facility
Related Videos
Setting up Pure Water Los Angeles with Hyperion AWPF
Sky’s the limit when it comes to DC Water, the Potomac Interceptor, and resiliency
The Power of Partnership: Big Creek Water Reclamation Facility Expansion
You dream it and we build it
Moving Los Angles one step closer to a more self-reliant water future
To help create a new, sustainable water supply for Los Angeles and maximize water reuse at the Hyperion Water Reclamation Plant, the Walsh/Brown and Caldwell design-build team is working with Los Angeles Sanitation and Environment to construct a 1.5 mgd Hyperion Advanced Water Purification Facility.
“Brown and Caldwell’s full collaborative delivery offering – encompassing owner advisor consulting, design partnering, at-risk contracting, and operations and maintenance services – provides clients a holistic design-build approach to developing cost-effective infrastructure solutions that align with their goals.”
Tim Masterson, PE, DBIA
Senior Vice President, Integrated Project Delivery Leader
“Brown and Caldwell’s full collaborative delivery offering – encompassing owner advisor consulting, design partnering, at-risk contracting, and operations and maintenance services – provides clients a holistic design-build approach to developing cost-effective infrastructure solutions that align with their goals.”
Tim Masterson, PE, DBIA
Senior Vice President, Integrated Project Delivery Leader
Related Projects
Lewiston Water Treatment Plant Retrofit
Hyperion Advanced Water Purification Facility
Process Water Reclamation Facility
Big Creek Water Reclamation Facility
Southwestern Parkway Combined Sewer Overflow Basin
New Class A Biosolids and Energy Facility at Blue Plains Advanced Wastewater Treatment Plant
RM Clayton Water Reclamation Center Headworks
Oakley Station Separation Sewer Project
North and South Complex Water Quality Improvements
Johns Creek Environmental Campus
Indian Head Wastewater Treatment Plant Upgrades
Former Manufacturing Facility Site Remediation
Former Nuodex Site Remediation and Restoration
Groundwater Remedial Action Construction
Turnkey Excavation and Dewatering Design-Build
Cogeneration System Upgrade
Biological Nutrient Removal Pilot Facility
Design-build expedites remediation
Related News
South Carolina Water Conference
BC Compliance News: January 2026 environmental regulations
Pacific Water Conference
NEWEA 2026 Annual Conference & Exhibition
DBIA Water/Wastewater Conference
BC Compliance News: November 2025 environmental regulations
Related News
South Carolina Water Conference
BC Compliance News: January 2026 environmental regulations
Pacific Water Conference
Related Papers and Reports
- To the RESCU: Lessons from Using Progressive Design-Build to Deliver Agency’s Largest Program
- The State of the Practice of Class-A Anaerobic Digestion: Update for 2005
- The Thermal Hydrolysis Link to Anaerobic Digestion: The Heart of the DC Water Biosolids Program
- Three Procurement Methods and a Major Sole Source Used to Implement DC WASA’s $300+ Million Biosolids Program
- Implementation of a Computerized Maintenance Management System for the City of Atlanta
- Thermal Hydrolysis Considerations for Pre-Digestion Solids Processing