Fulton County, Ga.’s state-of-the-art, zero-noise, zero-odor wastewater treatment plant has been recognized with multiple industry awards. The $137 million Johns Creek Environmental Campus design-build project was completed in only 40 months, and faced numerous requirements due to its proximity to local neighborhoods. The design features low-impact elements with extensive noise and odor abatement technologies, and will use membrane bioreactor technology to treat wastewater for non-potable reuse. At the time of its opening it was the largest MBR plant in the United States.

Zero-Impact MBR plant wins multiple awards

Zero-Impact MBR plant wins multiple awards
Awards
-
2010
McGraw Hill Construction Southeast Construction, Best Civil/Public Works Project
-
2010
Design-Build Institute of America Southeast, Best Overall Design Build Project in the SoutheastGreater Applications and Innovations Technology Local Government Award
-
2010
Design-Build Institute of America, Best Water Wastewater Project Greater than $25 Million
-
2010
Engineering News Record, ENR Best of the Best
-
2010
Liberty Mutual, Gold Safety Award
Related Projects
Big Creek Water Reclamation Facility
James R. DiIorio Water Reclamation Facility Ntensify® Nutrient Removal
Southwestern Parkway Combined Sewer Overflow Basin
Southeast Plant Biosolids Digester Facilities
Greenfield Water Reclamation Plant Expansion
Kaneohe-Kailua Regional Wastewater Treatment Plant, Facilities Plan, Tunnel Influent Pump Station (TIPS)
Lake Oswego Interceptor Sewer
Process Water Reclamation Facility
New Class A Biosolids and Energy Facility at Blue Plains Advanced Wastewater Treatment Plant
Littleton/Englewood Wastewater Treatment Plant
Wastewater Plant Tertiary Treatment and Transmission Pipeline
Ultrafiltration Technology Pilot Study
Trickling Filter/Solids Contact System Design and Implementation
RM Clayton Water Reclamation Center Headworks
Pure Water San Diego Potable Reuse Program
Program Management
Oakley Station Separation Sewer Project
North 27th Street Inline Storage System
Industrial Reuse and Aquifer Replenishment Project
Indian Head Wastewater Treatment Plant Upgrades
Greenfield Pre-Treatment Plant
Dixie Drain Phosphorus Removal Facility
Discharge Treatment Analysis
Cogeneration System Upgrade
Chambers Creek Regional Wastewater Treatment Plant Expansion
Biosolids Flow-Through Thermophilic Treatment Design and Implementation
Biological Nutrient Removal Pilot Facility
Annacis Island and Lulu Island Wastewater Treatment Plants
Biosolids Management Program Upgrade
Related News
- BC Insider: Challenges and opportunities in the Colorado River Basin
- Brown and Caldwell to develop Southern California drought mitigation study
- BC Compliance News: February 2023 environmental regulations
- Career Branding in the Water Industry With Jenelle Armstrong
- Design-Build for Water/Wastewater Conference 2023
- Food and Beverage Environmental Conference
- BC Compliance News: January 2023 environmental regulations
- Pacific Water Conference
- WCDA presents awards at quarterly meeting
- BC Compliance News: December 2022 environmental regulations