BC was responsible for the delivery of the design of a 45 mgd pump station, headworks facility, and supporting facilities. The four-level, below-grade pump station is constructed within the Kailua tunnel shaft, and is designed with dual drywells and wetwells to enhance redundancy. The headworks facility includes screening and grit removal processes in an enclosed, acoustically treated building to minimize noise and odor nuisances. BC also designed flow diversion structures for a new 3-mile-long, 10-foot-diameter wastewater tunnel from Kaneohe to Kailua. The wastewater conveyance and storage tunnel connects the existing Kaneohe Wastewater Pretreatment Facility (KWPTF) to the existing Kailua Regional Wastewater Treatment Plant (KRWWTP). Four microtunnels and diversion structures were also designed and constructed to divert flows to the tunnel. Supporting facilities for the tunnel and pump station at KRWWTP and KWPTF include standby generator facilities, a medium-voltage electrical distribution system, multiple odor control systems, a state-of-the-art headworks facility, tunnel appurtenances, and various flow diversion structures. This project also includes several innovative features including a tunnel junction structure with dual vortex drops for flow management, a complex tunnel ventilation and odor control system, a tunnel access crane bay for servicing the tunnel, dual trench-type wetwells and dual drywells for pumping redundancy, a unique shallow pump station built into the TIPS shaft wall to handle dry weather flows from Kailua, and an inventive screenings/grit conveyance system to reduce odors and maintenance.
Related Projects
Hyperion Advanced Water Purification Facility
Process Water Reclamation Facility
Big Creek Water Reclamation Facility
James R. DiIorio Water Reclamation Facility Ntensify® Nutrient Removal
Southwestern Parkway Combined Sewer Overflow Basin
Southeast Plant Biosolids Digester Facilities
Greenfield Water Reclamation Plant Expansion
Lake Oswego Interceptor Sewer
New Class A Biosolids and Energy Facility at Blue Plains Advanced Wastewater Treatment Plant
Littleton/Englewood Wastewater Treatment Plant
Wastewater Plant Tertiary Treatment and Transmission Pipeline
Ultrafiltration Technology Pilot Study
Trickling Filter/Solids Contact System Design and Implementation
RM Clayton Water Reclamation Center Headworks
Pure Water San Diego Potable Reuse Program
Program Management
Oakley Station Separation Sewer Project
North 27th Street Inline Storage System
Johns Creek Environmental Campus
Industrial Reuse and Aquifer Replenishment Project
Indian Head Wastewater Treatment Plant Upgrades
Greenfield Pre-Treatment Plant
Dixie Drain Phosphorus Removal Facility
Discharge Treatment Analysis
Cogeneration System Upgrade
Chambers Creek Regional Wastewater Treatment Plant Expansion
Biosolids Flow-Through Thermophilic Treatment Design and Implementation
Biological Nutrient Removal Pilot Facility
Annacis Island and Lulu Island Wastewater Treatment Plants
Biosolids Management Program Upgrade
Related News
- Rehabilitating Derby City’s 150-year-old old sewer infrastructure puts the community first
- American Exploration & Mining Association
- BC Compliance News: November 2024 environmental regulations
- CalCIMA Education Conference
- Idaho Mining Conference
- Brown and Caldwell joins 10th annual Imagine a Day Without Water campaign
- International Water Conference
- BC Insider: How to address fugitive methane at water resource recovery facilities
- BC Compliance News: September 2024 environmental regulations
- Rocky Mountain Water Conference