Due to potential water use restrictions during drought conditions, this US petroleum refinery identified the City’s WWTP as a resilient source for water. Brown and Caldwell developed water quality standards and designed the WWTP tertiary treatment and transmission pipeline to position the client to reduce water risk. The project also positioned the City to realize a new revenue source while effectively adding capacity to the potable water supply system.