How a Physical Pump Model Helped Saved Construction Costs and Reduce O&M Headaches
The existing Lake Townsend Dam (and integral raw water pump station) in Greensboro, NC (City) was failing due to alkali…
The existing Lake Townsend Dam (and integral raw water pump station) in Greensboro, NC (City) was failing due to alkali…
The US Sustainable Remediation Forum (SURF) created this Framework to enable sustainability parameters to be integrated and balanced throughout the…
Ex-situ biotreatment was the selected remedy for the source areas at a Superfund site (Site) impacted with chlorinated and non-chlorinated…
Brown and Caldwell conducted a pilot test to remediate trichloroethylene (TCE) in groundwater associated with past operation of a Formerly…
The presence of microconstituents in effluents from municipal wastewater treatment plants (WWTPs) and their receiving waters has attracted considerable recent…
This paper documents the activities, results, and conclusions from pilot testing of copper and nickel removal technologies for the proposed…
Microconstituents are beginning to make their way into discharge permits in the United States. Removal of microconstituents often requires tertiary…
The City of West Hollywood has implemented a multi-year program to annually clean, inspect, and rehabilitate approximately 10% of their…
Pumping stations are a critical component of the Metropolitan Council Environmental Services (MCES) collection system. Traditional operations and maintenance (O&M)…
When City of Lake Oswego officials and their design consultant realized that the interceptor sewer running through the middle of…
The City of Virginia Beach (City) began working with Brown and Caldwell on the development of a Management, Operations and…
The Hampton Roads Sanitation District (HRSD) in Virginia Beach, Virginia, collects wastewater from fourteen area localities and conveys the wastewater…