Googong Water Treatment Plant and Pump Station
…and the National Capital Development Commission has undertaken construction of the Googong water supply project, located on the Queanbeyan River, 9 km south of Queanbeyan in NSW. This project, when…
…and the National Capital Development Commission has undertaken construction of the Googong water supply project, located on the Queanbeyan River, 9 km south of Queanbeyan in NSW. This project, when…
…to achieve very low reporting limits for metals and organics. Two case studies are presented, one in a river tributary to Puget Sound and the other in the Columbia River….
…of the Hilo Waste Water Treatment Plant (WWTP) wastewater plume in relationship to a 1,000-foot radius around the outfall diffuser using a tracer dye. Treated wastewater from the Hilo WWTP…
…wastes. In addition, concerns over landfilling high liquid volume waste and the potential for generating troublesome leachates have caused the City of Lincoln to implement a comprehensive liquid waste handling…
…entities listed above) and the City of Palo Alto Water Utility have jointly undertaken a Water Reclamation Master Plan, completed in April 1992. The purpose of this Master Plan was…
…• Achieve effective air treatment to minimize off-site odors and the potential for complaints from neighbors • Maintain safe working conditions in buildings with odor exposure. • Complying with NFPA…
…higher performance demands requires that the competing reactions of floc aggregation and breakup be maximized and minimized, respectively. Accordingly, the goal of this study was to develop an improved understanding…
…effluent to the Jordan River. Following passage of the Federal Water Pollution Control Act Amendments (PL 92-500) in 1972, regional planning efforts were undertaken to find solutions to the water…
…more conclusive determinations as to the extent of the problem. Comparison of integrated geophysical results with “ground truth” information derived from borehole logs and groundwater quality data further eliminates uncertainties….
…analysis, remaining within the financial capability of the community to fund the plan, and (3) the use of performance indicators to achieve SSMP long-range goals. To support the long-term goals…
…agreement to eliminate discharge to Oak Creek. Following a study of its options, KVID selected a zero discharge plan for disposal which was environmentally sound and cost-effective – constructed wetlands….
…fish. While evidence has accumulated to show that microorganisms can be a cause of MeHg formation, concurrent attempts to identify the compound in natural waters or sediments have not fared…