Brown and Caldwell Home Page
Technical Papers RECENT PAPERS    ALL PAPERS

Brown and Caldwell engineers and scientists are technical and thought leaders in the environmental sector. Meet the people who have been advancing innovation for more than 70 years.
Author      Title/Abstract      


San Ramon Valley Reclamation Project
Author: Richard J. Stenquist
Date: 2/184
Presented at Conference on Water Reuse in the Bay Area, Emeryville, California, February 14, 1984

The Dublin San Ramon Wastewater Treatment Plant serves the residents of the Dublin San Ramon Services District (District) and the City of Pleasanton on a contract basis. The activated sludge secondary treatment plant is located near Interstates 680 and 58 in Pleasanton. The average dry-weather flow (ADWF) capacity of the plant is 9 million gallons per day (mgd), and the peak wet-weather flow capacity utilizing flow equalization is 18 mgd.1

This library contains published materials for which copyrights may be owned by entities other than Brown and Caldwell, but which are stored for limited uses by BC employees. Technical papers authored by BC employees generally may be printed and shared electronically with clients and prospective clients outside BC. Technical papers cannot be sold, and technical papers shared outside BC must have proper attribution of the original sponsoring organization or conference where the paper was presented. This attribution is embedded in each technical paper file when it is loaded into this library. Published articles from magazines or trade journals which are stored in this library are FOR INTERNAL USE ONLY and SHOULD NOT be distributed to clients or others outside BC, without express permission of the copyright owner. For questions regarding copyrights associated with any document in this library, or questions regarding copyrights in general, contact the Legal Department.